OcCre Ulises

Started by StuartE

12 updates 109 likes 17 comments

Bulwark and keel added

Bulwarks and keel added to the hull along with the rubbing strake. Next job to add a sealing coat to the hull using EZE-Kote and then rub down with wet'n'dry paper for prepping for undercoat.....
Only problem to solve next is finding a big enough box and location to do the spraying. Previous boats have been smaller so no problem in a packed shed.🤔
Liked by Wolle and hermank and

Sign in to comment on this update.

Finished...

Sorry I dropped off updating the blog, but after 3 years, its now finished! 😁😊
Liked by whittonm and Trident73 and
2 comments
  1. Rogal118Silver
    Captain
    Who needs a blog with a set of photos of such a cracking job like this.Shes a beauty, you must be so proud of her. thanks for sharing the photos.
    Liked by Len1 and Wolle and

Sign in to comment on this update.

Delete this post?

It will be removed from the site.

Discard this draft?

Your draft will be deleted and cannot be recovered.

You have an unfinished draft

What would you like to do with it?