Forceful Directors Class Paddle tug

Started by Kevin55

41 updates 292 likes 39 comments
Kevin55 #42 of 42 6

Paddle Boxes underway

Started work on the paddle boxes now that the upper deck position is fully established.
Cut out the paddle box fronts and backs, and milled the slots in the front panels. The bars between the slots are understandably flexible at this stage, so these will be strengthened as part of the next step.

I’ve also begun forming the paddle‑box steps. Each step is being made individually so they can be trimmed and adjusted to ensure the final overall height aligns precisely with the upper‑deck step.
Liked by stevedownunder

Sign in to comment on this update.

Delete this post?

It will be removed from the site.

Discard this draft?

Your draft will be deleted and cannot be recovered.

You have an unfinished draft

What would you like to do with it?